Silver Lake Regional High School Theatre
Kingston, MA

     

DRA provided theater planning and design services for two new theaters in this regional school district.  Similar to the challenge of the Memorial Boulevard Theater project, each of these construction efforts were undertaken within an occupied school site throughout the duration of the phased construction.  The Middle School theater facility is a 350-seat venue.  The High School theater is a 750-seat facility featuring caliper arm stages and fly with technical grid.  Team member Sarah Roth served as Job Captain and Designer for these spaces, James Barrett served as Principal in Charge for the work.

Details:

New Construction
175,000SF
Renovations
45,000SF
Project Cost
47.3 Project Cost Esitmate
2007

 

Principal in Charge:

James A. Barrett, AIA, LEED

To learn more about this project, services provided, and our Performing Arts practice, please email us:

info@draws.com
 

Massachusetts Studio
235 Bear Hill Road, Fourth Floor
Waltham, MA 02451
T. 617.964.1700
F. 617.964.1701

Connecticut Studio
225 Oakland Road, Studio 205
South Windsor, CT 06074
T. 860.644.8300
F. 860.644.8301

 

Portfolio - DRA Architects